欧美v亚洲v日韩v最新在线_免费国产va在线观看视频_久九九精品免费视频_国产又粗又大又湿视频

<bdo id="ngaxn"></bdo><pre id="ngaxn"><tt id="ngaxn"><rt id="ngaxn"></rt></tt></pre>

<dfn id="ngaxn"></dfn>

        Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

        Aluminum alloy sacrificial anode

        magnesium anode, zinc anode

        Telephone:

        0391-7588881 +8618739187123

        Jiaozuo Libo Light Alloy Co., Ltd.

        Q & A

        Where the current test pile is installed, does it need to test the pile at potential?

        • Author:Libo
        • Source:wwww.vw-zone.com
        • Date:2021-06-11
        • Click:0

        The current test pile is mainly used to detect the current in the pipeline, while the potential test pile is mainly used to detect the protection point. Generally, a test pile is installed at 1km and a current test pile at 10km during construction, so the potential test pile is generally not required where the current test pile is installed.

        Online
        聯(lián)系方式

        熱線電話

        18739187123

        上班時間

        周一到周五

        公司電話

        0391-7588881